Dredging works at MHC
Manila Harbor Center (MHC), in cooperation with Prime Metro BMD, recently completed dredging along the quay side to maintain the safe berthing of vessels.
Depth alongside the terminal’s 1,035-meter berth has now reached a draft maximum of 10.5-meter MLLW, a development t…
Tags: